Projects

St. Croix Crossing Bridge Railing 3-2016 to 11-2016

Approx. 5000 Lineal Feet of MNDOT structural railing and posts
Brush blast galvanized railing and posts, Anti-Gassing Epoxy primer, Super Durable Polyester Top Coat.  Project processed per MNDOT standards and specs.

University of St. Thomas Football Field   6-2019 to 9-2019

Hand Railing, Deco Wall Panels, Lettering and Logo
Blast Clean, Epoxy Powder Primer, Custom TGIC Purple and White top coats.

Minnesota Zoo Treetop Trail Railing  11-2022 to 6-2023

3300 Individual Railing Panels 
Blast clean all railings, Zinc Rich Powder Primer, Custom Color Super Durable Polyester Top Coat.


Mendota Bridge Railing   4-2023 to 1-2024

Approx. 6555 Lineal Feet of MNDOT Structural Railing
Brush blast galvanized railing and posts, Anti-Gassing Epoxy primer, Super Durable Polyester Top Coat.  Project processed per MNDOT standards and specs.


Scroll to Top